04 October 2009

The tiller has landed!



The old post was cut & ground off, the hole enlarged and some bolt holes drilled for the top bearing. The lower bearing sticks out on a bracket.
Fastened between the two bearings is the clamp arm pictured in a my last blog post.

Other things done today include the mounting points for the calorifier support being drilled (my dad did this and had a pig of a time drilling through the C section, it must have been hardened or something!), the Stern Drive was filled with oil and the morse cable connected.

No comments: