29 October 2009

Some shots from the past few weeks.



I made a support for the calorifier to bolt into the engine bay.



The support and tank installed.



All plumbed in, Eber fitted and being tested


04 October 2009

The tiller has landed!



The old post was cut & ground off, the hole enlarged and some bolt holes drilled for the top bearing. The lower bearing sticks out on a bracket.
Fastened between the two bearings is the clamp arm pictured in a my last blog post.

Other things done today include the mounting points for the calorifier support being drilled (my dad did this and had a pig of a time drilling through the C section, it must have been hardened or something!), the Stern Drive was filled with oil and the morse cable connected.