04 March 2009

These are some pics taken over the last few weeks, sorry Dobson for not updating sooner :o(


Widened kitchen floor, at the top you see the cabin floor, the bottom is the kitchen floor, a couple more inches either side!

Knocked up a simple couple of wooden rails over the sink to rain off the washing up. Note the bacon.


Instead of routing the cables under the cabin floor, they're now going through the bulkhead into the engine bay.

This involves moving a 240v mains socket to the left a bit, you can see where the conduit used to drop down below the floor.

The same thing on the other side.

Holes made (eventually), lined and conduit poked through.

Poking out in the engine bay.

All holes foamed back up!


An important milestone was reached, the first bacon butty.

With ketchup.


The latest project is a gutter around the back deck (preparing for summer, ho ho ho!).

Hiding the terrible welds with filler. Is there nothing filler can't hide?

Finally for this blog, a preview of the internal guttering, for run-off from the desk boards.

1 comment:

Anonymous said...

What a fantastic bloke! Must have super parents!!!